The craft, not the buttons

Guides on how the work is actually done well: why quantities are taken off, how they should be organised, what can honestly be promised at each phase, and who decides when something clashes. Craft knowledge that holds up with any tool.

Phases and documents

Project phases: SD, DD, CD and what they mean

The same point of maturity has five or six names depending on country and sector. The table that translates them, what each discipline delivers in each phase, and how firm a budget can be at each point.

Read the guide →
BIM coordination

BIM clashes: types, priority and who resolves them

The five clash types, how to set tolerances so you do not drown in false positives, the hierarchy that decides what moves, and the escalation ladder for who actually decides.

Read the guide →
The role

What a BIM coordinator does

What they actually decide, how the role differs from a modeller and a BIM manager, where the craft came from, and the documents that govern the work.

Read the guide →
Documents and traceability

Drawing revisions: the cloud, the delta and the block

How change is marked on a sheet, the issue states, the difference between an addendum and a change order, and what to do when a new revision lands.

Read the guide →
Deliverables

Which drawings to issue at SD, DD and CD

Sheet by sheet, with scales and counts: what you issue at each phase, what each drawing shows and how many there are. A ten-storey building compared against a two-storey house.

Read the guide →
Drafting and schedules

Dimensioning, tagging and schedules that work

The dimension strings a plan needs, what you dimension to, how doors and rooms are numbered, and how schedules are built so they come out of the model, not your hands.

Read the guide →

What is coming

These guides come out of the VDClens Academy syllabus, the training programme we are writing. Next in line:

  • Line of balance: scheduling by rhythm instead of by dates
  • How a quantity take-off is done well, and what it is for afterwards
  • Production rates: the number nobody writes down and everybody uses
  • Scanning and point clouds: when it is worth it and what accuracy to expect

Every number, with its origin

VDClens carries a construction project from the model to the site in one application: quantities, budget, schedule and field. Every quantity stays tied to the sheet, the revision and the date it came from.